Lexington UMC 2006 Habitat Build

Photos From 2007 Lexington Methodist Habitat Project

Week/Ending August 11, 2007

Getting Ready
Getting Ready

Planning

Planning

Pause Before Work

Pause Before Work

Squad Ready for Inspection

Squad Ready for Inspection

Framing Walls

Framing Walls

When do I get to hammer?

When do I get to hammer?

A Well Attached Footer

A Well Attached Footer

Laying Down Those Studs

Laying Down Those Studs

Chop Saw at Work

Chop Saw at Work

Outside Panel on Walls

Outside Panel on Walls

Outside Panel Ready for Nails

Outside Panels Ready for Nails

Raising the Walls I

Raising the Walls I

Raising the Walls II

Raising the Walls II

Walls Raised!

Walls Raised!

Braced

Braced

An Endless Supply of Nails

An Endless Supply of Nails

Back Wall Up

Back Wall Up

Front Wall Up

Front Wall Up

Must Be Lunch Time

Must Be Lunch Time

Roof Time

Roof Time

Styrofoam

Styrofoam

Roof Up; Interior Framing Being Discussed

Roof Up; Interior Framing Being Discussed

The Project Sign

The Project Sign

Decking the Roof

Decking the Roof